国产女人高潮抽搐喷水视频,一个人在线视频观看,国产区图片区小说区亚洲区,av在线亚洲男人的天堂

Slurry Balance TBM

Slurry Balance TBM is adaptable to the geological condition of low ground water pressure and high soil permeability coefficient, which is widely applied to the operation of road, rail tunnels crossing the river and sea.
NHI’s Slurry TBM adopts the advanced technology of air cushion bentonite, which can control the pressure of tunnel face accurately and reduce the impacts of land subsidence. The cutter can be selected flexibly by the geological condition in order to achieve the maximum efficiency. Moreover, it adopts the proprietary technology of changing cutter under normal pressure, which achieves the safe activities of changing cutter with normal pressure underwater. The core technology of slurry system’s high-pressure scouring can ensure that the cutter cannot be incrusted when conducting soft ground construction. The seal for main drive adopts specific technology. Slurry balance TBM can be operated continually under pressure of 10bar for 10000 hours. This product improves the safety performance and reliability for constructions of large, long and deep tunneling.

主站蜘蛛池模板: 宜州市| 大同市| 锡林浩特市| 宁强县| 昌邑市| 湟源县| 武山县| 宁安市| 桐梓县| 视频| 新平| 宜黄县| 信宜市| 涪陵区| 湄潭县| 大姚县| 江永县| 交城县| 政和县| 墨竹工卡县| 清远市| 桂平市| 芜湖市| 温宿县| 海南省| 林芝县| 聊城市| 定州市| 赤水市| 甘肃省| 霍城县| 历史| 华宁县| 郧西县| 仙桃市| 吉隆县| 沾化县| 应城市| 教育| 洛隆县| 新丰县|